Faisalabad: Commissioner Silwat Saeed has instructed the district administration to expedite the completion of development projects, ensuring that all required protocols are followed.
Read: CM Maryam reveals IT City, Safari Park plans for FSD
As reported on October 22, Commissioner Silwat reviewed ongoing projects and approved the implementation of the model village scheme in Chak No. 44-GB, Tehsil Sammundri. She also directed the revision of plans for the 6.5 km road construction and rehabilitation project from Chak No. 106-JB to Chiniot, emphasising its swift completion. In a different development, it has been reported that the Water & Sanitation Agency (WASA) has successfully repaired two major sewerage lines on Sargodha Road near Muslim Town No. 2 and Sheikhupura Road.
Read: WASA FSD introduces 15 citizen-centric schemes under ADP
Managing Director Aamer Aziz highlighted that these lines, which had been causing significant inconvenience, were repaired swiftly using heavy machinery. The sewerage system in areas such as Gulistan Colony No. 1, Islamia Park, and Muslim Town has been fully restored. |
|